Blue Canyon Technologies to provide spacecraft for two NASA demo missions

Wednesday July 10, 2019 0 comments Tags: Boulder, Blue Canyon Technologies, NASA, George Stafford

BOULDER -- Small satellite manufacturer Blue Canyon Technologies (BCT) announced it has been selected by NASA’s Space Technology Mission Directorate’s Small Spacecraft Technology program and NASA’s Ames Research Center in California’s Silicon Valley, in collaboration with the University of Florida and MIT, to provide multiple 3U spacecraft for its CubeSat Lasercom Infrared Crosslink (CLICK) flight demonstration missions.Blue_Canyon_logoUSE

BCT said the CubeSats will be used for separate demonstration missions: the first is a laser space-to-ground demonstration mission and the second will demonstrate laser crosslinks and ranging in low-Earth orbit.

“BCT has a unique advantage as a spacecraft bus provider as it is equipped to support high-rate body-pointed lasercom capabilities with our flight-proven precision stability and pointing,” said George Stafford, BCT president and CEO.

The new communication capabilities demonstrated by CLICK will enable new classes of small satellite missions like swarms for remote sensing or global constellations for communications.

“Demonstrating precision timing and ranging over a lasercom crosslink using BCT CubeSat platforms will enable new capabilities for coordinated and distributed sensing missions," said Kerri Cahoy, associate professor of Aeronautics and Astronautics at MIT.

The 3U spacecraft uses BCT’s heritage XB1 avionics to provide a state-of-the-art CubeSat platform that maximizes payload volume. The spacecraft includes ultra-high-performance pointing accuracy, a robust power system, command and data handling, RF communications, and dedicated payload interfaces.

The spacecraft bus will be developed and tested at BCT’s Spacecraft Manufacturing Center in Colorado.

BCT is currently building more than 60 spacecraft for government, commercial and academic missions. The company has doubled in size over the past 12 months and plans to open its new 80,000-square-foot headquarters and production facility in 2020.